
The Arizona Board of Regents approved five University of Arizona project areas totaling $160.9 million, led by deferred maintenance and lab MEP upgrades, while a submitted 2029 to 2031 plan adds new campus housing.
The University of Arizona has the green light for its next round of campus investment. At its meeting last week, the Arizona Board of Regents approved the university’s capital plan for the year: five new project areas totaling $160.9 million, with a big share aimed squarely at the systems that keep buildings running. The university has also submitted a 2029 to 2031 plan that puts expanded campus housing on the list.
What the regents approved
The largest piece is $55 million for deferred maintenance, covering fire alarm upgrades, elevator code compliance, plumbing and street repairs, utility infrastructure upgrades, and building automation. System revenue bonds will provide $45 million of that total. Another $52.3 million will modernize aging research facilities, including upgrades to their mechanical, electrical, and plumbing infrastructure. The rest of the plan includes $17.6 million for campus-wide technology modernization, $15 million for campus safety and scalable security infrastructure, and $21.02 million to modernize student spaces, cultural venues, and classrooms (with $20.07 million of that financed).
Joshua Wright, the university’s chief facilities and planning officer, gave the regents a sense of the scale involved: roughly 763 buildings and about 19.8 million square feet of space, with a presence in all 15 Arizona counties through cooperative extension. He noted that the main campus co-generates about 42 percent of its own power and generates more than 90 percent of its own water, called that utility infrastructure unique among universities, and said deferred maintenance is critically important. He added that many research buildings are older and need significant renovation for the university to remain one of the country’s premier research institutions.
Campus housing in the next plan
Looking further out, the university submitted a capital improvement plan for 2029 through 2031 with $183.5 million in high-priority building construction and renewal costs. The regents have not yet approved it, and board documents did not assign dollar figures to individual projects. Its components include deferred maintenance for the highest-priority buildings, lab modernization, renovation of the Arizona State Museum, campus infrastructure to support growing utility demand from new and planned facilities, athletic venue improvements, and campus housing such as first-year, Greek, graduate student, and other specialty housing.
Why it matters to JFN
Capital plans like this one tell us where the plumbing and mechanical work on a campus is headed. Deferred maintenance, lab modernization, and utility upgrades are exactly the kind of work where piping, domestic water, and mechanical systems are replaced while buildings stay occupied, which takes careful phasing and coordination. And when a university names first-year, Greek, and graduate housing as future priorities, it signals the next generation of residence halls, with dense, repeated bathroom groups and central plant connections, is already being planned. We have built student housing in Tucson and across Arizona for years, and we are glad to see the U of A investing in the infrastructure behind its campus.
Sources: Arizona Daily Star, October 3, 2026; AZBEX, October 6, 2026
News + Impact curates positive stories from across our industry. JFN Mechanical is not affiliated with the projects or organizations covered unless noted. Join the conversation on LinkedIn.
All News + ImpactMore News + Impact
View allGorman & Company Opens The Post at Fort Whipple, 103 Veterans Apartments in Prescott
Six early-1900s officers' quarters and a new four-story building now provide 103 affordable, permanent-supportive apartments for Northern Arizona veterans on the VA campus in Prescott.
Read more about Gorman & Company Opens The Post at Fort Whipple, 103 Veterans Apartments in PrescottOne Camelback Opens as 163 Apartments in a Converted Uptown Phoenix Office Tower
Kinella Capital has finished converting the 11-story former BMO Harris Bank tower at Central and Camelback into 163 apartments, with a 150-foot atrium, a rooftop pool,…
Read more about One Camelback Opens as 163 Apartments in a Converted Uptown Phoenix Office TowerSloan Turns 120 and Oatey Turns 110 as Two Plumbing Pioneers Mark Milestones
Sloan, inventor of the Royal Flushometer, and family-owned Oatey are both celebrating major anniversaries this fall, with a focus on water-saving innovation and the next generation…
Read more about Sloan Turns 120 and Oatey Turns 110 as Two Plumbing Pioneers Mark Milestones